Oil Portfolio Standardization Portal

One Portal. One Access. All Disciplines. All Data. All Processes.

JZ

AI BFD Generation

Generate a Basis for Design (BfD) using AI from project data and standard templates

Project data in → configuration and assembly → AI generation → human QA/QC → formally issued BfD

AI-Powered BfD Generation

Leverage Renaissance standards, historical projects and engineering knowledge to generate accurate, standardized BfDs in minutes.

View Workflow
  1. 1 Project Data Input & Configuration
  2. 2 Package B Rules & AI Processing
  3. 3 BfD Type Selection
  4. 4 AI Generation
  5. 5 Review & Refine
  6. 6 Visual Assets & Assembly
  7. 7 Draft for Review
  8. 8 QA/QC & Approval
  9. 9 Issue & Publish

1. Project Data Input

Provide the key project information for BfD generation

Project Portfolio *
Project Name *
Project Category *
Project Phase
Location / Asset
Project Description (Optional)
Supporting Files (Optional)

Upload Project Data

(BFD-01/02, asset info, field data, etc.)

Use Existing Project Data

2. Package B Rules & AI Processing

Apply standard rules and configure AI for generation

Apply Package B Rules

  • Decision rules (BfD type)
  • Tier determination logic
  • Section insertion logic
  • Standard paragraph library
  • Figures and visual assets
  • Renaissance BfD standards

AI Model Configuration

AI Model Generation Mode
Standard Enhanced

3. BfD Type & Tier (auto-determined)

AI will suggest BfD type and tier based on project inputs and Package B rules

BfD Type

BFD-01 (Onshore)

Suggested Tier

Tier 1 (SOR)

~ 5 – 15 pages

AI Recommendation
Based on project data and Package B rules. You can override if required.

Estimated Output

  • ~ 12 pages
  • Narrative + figures
  • Standard format
  • Ready for review

5. Generated BfD Preview

Review the AI-generated BfD before human QA/QC

RENAISSANCE

Basis for Design (BfD-01)

Nun River FOD Phase 1
Category 1 – Land (Onshore)

Document View Section Outline Figures (D) AI Insights

1.0 INTRODUCTION

1.1 Project Background

The Nun River Field Development (FOD) Phase 1 involves the development of new wells, crude stabilisation flowline, bulk line and manifold tie-in to the existing production facility. This Basis for Design (BfD) defines the engineering design basis, project scope, design criteria and assumptions.

4. Generation Progress

AI is generating the BfD using your inputs and Renaissance standards

  • Reading project data and extracts
  • Applying Package B rules
  • Generating BfD narrative (Package C)
  • Inserting figures and visual assets (Package D)
  • Assembling document (Package A)
  • Finalizing document...
85%

Estimated time remaining: 1 minute

AI Assistant

Ask about this BfD

Get suggestions, check standards, compare with similar projects.