Manual BFD Generation

Create a Basis for Design (BfD) using standard templates and engineering expertise

Project data in → configuration and assembly → human QA/QC → formally issued BfD

Engineering-Led BFD

Follow the standard workflow and use controlled templates to develop a complete, accurate and consistent Basis for Design.

View BFD Workflow
  1. 1 Project Data Input
  2. 2 Apply Package B Rules
  3. 3 Select BFD Type
  4. 4 Develop BFD (Pkg C, D & A)
  5. 5 Review & QA/QC
  6. 6 Formal Sign-Off
  7. 7 Issue & Publish

1. Project Data Input

Enter project information, asset data and scope

Project Portfolio *
Project Name *
Project Category *
Location / Asset
Project Phase *
Description
Upload Supporting Information

Drag & drop files here or click to upload

PDF, Excel, DWG, Images (Max 100MB)

  • XLS Asset_Data_Sheet.xlsx ×
  • PDF Field_Layout.pdf ×
  • PDF Environmental_Data.pdf ×
  • DWG Existing_Facilities.dwg ×
Save & Continue

2. Apply Package B Rules

Automatic guidance based on project category and scope

CAT 1 - Land (Onshore)

Applicable rules from Package B

  • BfD structure and content
  • Section insertion logic
  • Design criteria and assumptions
  • Standard paragraph library
  • Typical figures and schematics
  • Mandatory deliverables checklist
View Applied Rules

3. Select BFD Type

Choose the appropriate BfD template for this project

4. Develop BFD (Package C, D and A)

Use the standardized template and populate all sections manually

A. Narrative (Docx) D. Figures & Visuals C. Data & Appendices Section Navigator Open in Word
  • Cover Page
  • 1. Introduction
  • 2. Project Background
  • 3. Asset Description
  • 4. Design Basis
  • 5. Process Description
  • 6. Facilities Description
  • 7. Design Criteria
  • 8. Drawings and Figures
  • 9. References
  • Appendices
Calibri 11 BIU Autosaved 2 mins ago

4. Design Basis

4.1 General

This section defines the design basis for the Nun River FOD Phase 1 development. The design shall comply with Renaissance Africa Energy standards and applicable industry codes and standards.

4.2 Production Design Basis
ParameterValueUnitRemarks
Total Oil Production40,000BOPDPeak rate
Number of Wells4-Initial phase
Flowline Size4 / 6inchCS flowline
Bulkline Size6 / 8inchTo existing facility

Reference Documents

5. Review & QA/QC

  • Complete all sections (Pkg C, D & A)
  • Check against B5 mapping matrix
  • Verify data and calculations
  • Ensure figures and drawings included
  • Conduct internal peer review
  • Address comments and revise
Submit for Approval

6. Approval & Issue

Route to TA for formal review and sign-off

Engineer (Submit) TA (Review) Approved (Issue)

7. Output & Handover

Issued BFD will be saved in the approved library

Issue BFD