Portfolio performance for project managers and discipline leads — throughput, cycle time and AI uptake.

Cycle Time Is the Headline

Average approval cycle time is down to 5.4 days from 8.4 in February, driven by AI-drafted deliverables clearing review in roughly half the time.

18 Active projects Across 4 portfolios
284 Deliverables issued +34 this quarter
5.4 days Average approval cycle time −1.8 days vs Q1
42% AI-generated share 119 AI · 165 manual
Filters Reset

Projects by Phase and Status

18 active projects. Column height is the phase total; each band is a status.

Snapshot · 25 Nov 2026
  • In Progress
  • Under Review
  • Approved
  • AI Draft
0 2 4 6 BFD · In Progress: 2 projects BFD · Under Review: 1 project BFD · Approved: 1 project BFD · AI Draft: 2 projects 6 BFD Pre-FEED · In Progress: 2 projects Pre-FEED · Under Review: 1 project Pre-FEED · Approved: 1 project 4 Pre-FEED FEED · In Progress: 1 project FEED · Under Review: 2 projects FEED · Approved: 2 projects 5 FEED Execution · In Progress: 2 projects Execution · Approved: 1 project 3 Execution

Average Approval Cycle Time

Days from the engineer's submission to the last approved stage, all disciplines, February to September 2026.

−35.7%
0 3 6 9 Feb Feb 2026: 8.4 days Mar Mar 2026: 8.1 days Apr Apr 2026: 7.6 days May May 2026: 7.2 days Jun Jun 2026: 6.5 days Jul Jul 2026: 6.1 days Aug Aug 2026: 5.7 days Sep Sep 2026: 5.4 days 8.4 days 5.4 days

Axis in days. Target for FEED deliverables is 6 days.

AI-Generated vs Manually Generated Deliverables

Count and cycle time are different measures, so they are two charts on a shared legend rather than one chart on two axes.

  • AI-generated
  • Manually generated
Deliverables by discipline
0 25 50 Process Process · AI-generated: 38 deliverables Process · Manually generated: 41 deliverables 38 Piping Piping · AI-generated: 31 deliverables Piping · Manually generated: 46 deliverables 31 Mechanical Mechanical · AI-generated: 27 deliverables Mechanical · Manually generated: 39 deliverables 27 Instrumentation Instrumentation · AI-generated: 23 deliverables Instrumentation · Manually generated: 39 deliverables 23

Deliverables in this filter. AI counts labelled; manual counts are in the table below.

Average cycle time by discipline
0 4 8 Process Process · AI-generated: 3.4 days 3.4 Process · Manually generated: 6.8 days Piping Piping · AI-generated: 3.9 days 3.9 Piping · Manually generated: 7.4 days Mechanical Mechanical · AI-generated: 3.1 days 3.1 Mechanical · Manually generated: 6.1 days Instrumentation Instrumentation · AI-generated: 4.2 days 4.2 Instrumentation · Manually generated: 7.0 days

Days from submission to final approval. AI days labelled; manual days are in the table below.

Table view — AI-generated vs manually generated
Discipline AI deliverables Manual deliverables AI cycle time Manual cycle time
Process 38 41 3.4 d 6.8 d
Piping 31 46 3.9 d 7.4 d
Mechanical 27 39 3.1 d 6.1 d
Instrumentation 23 39 4.2 d 7.0 d
Total / average 119 165 3.7 d 6.8 d

Project Drill-Down

Every project in the current filter: phase, status, the deliverables it holds, how many of them AI drafted, and its average cycle time.

Project Category Phase Status Deliverables AI share Cycle time Action
Nun River FOD Phase 1 CAT 1 — Land BFD In Progress 24 46% 4.6 d Open
Ubie IOGD CAT 1 — Land FEED Under Review 38 32% 6.2 d Open
Gbaran Node CAT 2 — Swamp BFD AI Draft 17 71% 3.1 d Open
Belema North FOD CAT 2 — Swamp FEED Approved 41 38% 5.4 d Open
Otumara Node CAT 2 — Swamp Pre-FEED In Progress 22 41% 5.9 d Open
Forcados Urban Gas lift CAT 3 — Gas lift Execution Approved 33 27% 7.3 d Open
Showing 6 of 18 active projects · 284 deliverables issued · 5.4 days average cycle time View closed projects in the archive

Scheduled reporting

A weekly KPI pack can be issued to portfolio managers automatically, with the same filters applied and the drill-down attached as CSV.

Schedule Report