Reports & KPI
Portfolio performance for project managers and discipline leads — throughput, cycle time and AI uptake.
Cycle Time Is the Headline
Average approval cycle time is down to 5.4 days from 8.4 in February, driven by AI-drafted deliverables clearing review in roughly half the time.
Projects by Phase and Status
18 active projects. Column height is the phase total; each band is a status.
- In Progress
- Under Review
- Approved
- AI Draft
Average Approval Cycle Time
Days from the engineer's submission to the last approved stage, all disciplines, February to September 2026.
Axis in days. Target for FEED deliverables is 6 days.
AI-Generated vs Manually Generated Deliverables
Count and cycle time are different measures, so they are two charts on a shared legend rather than one chart on two axes.
- AI-generated
- Manually generated
Deliverables in this filter. AI counts labelled; manual counts are in the table below.
Days from submission to final approval. AI days labelled; manual days are in the table below.
| Discipline | AI deliverables | Manual deliverables | AI cycle time | Manual cycle time |
|---|---|---|---|---|
| Process | 38 | 41 | 3.4 d | 6.8 d |
| Piping | 31 | 46 | 3.9 d | 7.4 d |
| Mechanical | 27 | 39 | 3.1 d | 6.1 d |
| Instrumentation | 23 | 39 | 4.2 d | 7.0 d |
| Total / average | 119 | 165 | 3.7 d | 6.8 d |
Project Drill-Down
Every project in the current filter: phase, status, the deliverables it holds, how many of them AI drafted, and its average cycle time.
| Project | Category | Phase | Status | Deliverables | AI share | Cycle time | Action |
|---|---|---|---|---|---|---|---|
| Nun River FOD Phase 1 | CAT 1 — Land | BFD | In Progress | 24 | 46% | 4.6 d | Open |
| Ubie IOGD | CAT 1 — Land | FEED | Under Review | 38 | 32% | 6.2 d | Open |
| Gbaran Node | CAT 2 — Swamp | BFD | AI Draft | 17 | 71% | 3.1 d | Open |
| Belema North FOD | CAT 2 — Swamp | FEED | Approved | 41 | 38% | 5.4 d | Open |
| Otumara Node | CAT 2 — Swamp | Pre-FEED | In Progress | 22 | 41% | 5.9 d | Open |
| Forcados Urban Gas lift | CAT 3 — Gas lift | Execution | Approved | 33 | 27% | 7.3 d | Open |
Scheduled reporting
A weekly KPI pack can be issued to portfolio managers automatically, with the same filters applied and the drill-down attached as CSV.